On this article, we want to discuss about what artifacts that can be used for Lean Project management. There are several documents which are:
- Commissioning list (features scopes). it discusses features and product backlog. it contains vision, scope. The scope contains features, user story, user, and estimation efforts
- User story matrix. it contains matrix table for user story, users list, notification, and additional notes
- Iteration plan. it contains iteration number, iteration date, and the user story
- Regular report. it contains iteration number report, what already done, screenshot for each user stories that done, and additional question.
- User manual. it contains features as heading 1, user stories as heading 2, and step by step usage scenario OR how to video as a normal content.

Leave a Reply